Featured

Boil Advisory – LIFTED – St. Charles, Johnson Road to Lauretta

November 10, 2019 A Boil Advisory has been LIFTED for the St. Charles from Johnson Road to Lauretta Drive. Samples were collected and lab results indicated that NO contamination occurred due to these repairs.   Click here to read the full Press Release

Read More

Boil Advisory – LIFTED – Braybarton Circle

November 10 2019 A Boil Advisory has been LIFTED for the Braybarton Circle. Repairs have been completed, and samples have been sent for analysis indicated there is NO contamination as a result of this work.   Click here to read the full Press Release

Read More

North 7th Street Closure

Wednesday November 6, 2019 North 7th Street will be closed to thru traffic from Franklin Avenue to University Blvd from 7am until work is completed. This closure is necessary to repair a water line leak. Click here to read the full Press Release

Read More

Valve and Line Replacement Phase II, Efts Lane

Monday November 4, 2019 Contractors will resume the Phase II Valve Replacement and Line Replacement Project with the replacement of the main water line on Efts Lane. This portion of the project is expected to last through January 2020.   Click here to read the Full Press...

Read More

Boil Advisory – LIFTED – Garfield Ave & Rosemont Ave

October 30, 2019 A Boil Advisory has been LIFTED for Garfield Ave and Rosemont Ave. and anyone else that has experienced low water pressure. This was due to a fire hydrant installation. Samples were collected by the water department and test results showed NO contamination due to the Hydrant Installation.   Click here to read the Full Press...

Read More

Valve Replacement Project – Downtown Market Street

Tuesday October 29, 2019 starting at 7am and continuing until completed, the Water Department and contractors will have westbound traffic on Market Street from 4th Street to 5th Street closed to thru traffic and Commercial Alley from Market Street to the dollar tree parking lot side entrance closed.  These closures are needed to excavate main water lines in preparation for new valve insertions...

Read More
WordPress Appliance - Powered by TurnKey Linux