Uncategorized

Boil Advisory – Chestnut Street

A Boil Water Advisory has been issued for the 2600 Hundred Block of Chestnut ST. and the 2600 Hundred Block of Whitehaven Blvd.  Also anyone in this area that may have experienced Low Water Pressure.  Until further notice, consumers should vigorously boil, for at least one minute, any water used for drinking (including water used to make ice), cooking or oral hygiene.   Click here to read...

Read More

Boil Advisory – 3200 block of St. Charles Drive

JULY 11 2019 A Boil Advisory has been ISSUED for the 3200 block of St. Charles Dr. due to a main line break. Until further notice, customers in the area should vigorously boil the water prior to consumption. Repairs have been completed, and samples will be sent for analysis to indicate there is NO contamination as a result of this work, another notice will be issued informing customers that this...

Read More

Boil Advisory – Pine Valley Dr.

A Boil Water Advisory has been issued for Pine Valley and anyone in this area that may have experienced Low Water Pressure.  Until further notice, consumers should vigorously boil, for at least one minute, any water used for drinking (including water used to make ice), cooking or oral hygiene.   Click here to read the Full Press...

Read More

Boil Advisory -LIFTED- Braybarton Circle

July 3, 2019 the Boil Advisory has been LIFTED for the Braybarton Circle area that experienced a main line break on June 28, 2019.  Testing indicated that no contamination had occurred to the drinking water.  There is no need to further boil water at this time.   Click here to read the Full Press...

Read More

Boil Advisory Braybarton Circle

A Boil Advisory has been ISSUED for the Braybarton Circle due to a main line break. Until further notice, customers in the area should vigorously boil the water prior to consumption.

Read More

Street Resurfacing Improvements

On Saturday, June 29, 2019 at 7:00 A.M. and resuming work on Monday, July 1, 2019 and continuing throughout the week; weather permitting. The Contractor will begin placing the new hot-mix asphalt surface course on the project streets.   Click here to read the Full Press...

Read More
WordPress Appliance - Powered by TurnKey Linux